Product Description |
Products |
Name |
Rubber bushing |
Products category |
automotive rubber parts/rubber molded parts |
Material |
EPDM,NR,SBR,Nitrile, Silicone, Fluorosilicone, Viton(FKM), Neoprene, Urethane(PU), Polyacrylate(ACM), Ethylene Acrylic(AEM), HNBR, Butyl(IIR), plastic like material (TPE, PU, NBR, silicone, NBR+TPE etc) |
Size |
All size and thickness available. |
Shape |
capable of all shapes as per drawing |
Color |
Natural,black, Pantone code or RAL code, or as per client's samples or requirements |
Hardness |
20°~90° Shore A, usually 30°~80° Shore A. |
Surface finishing |
Texture (VDI/MT standard, or made to client's sample), polished (high polish, mirror polish), smooth, painting, powder coating, printing, electroplating etc. |
Drawing |
2D or 3D draiwng in any image/picture format is OK |
Free sample |
Yes |
OEM/OEM |
Yes |
Application |
Household, electronics, for vehicles like GM, Ford, Renault, Honda. Machinery, hospital, petrochemical, Military and Aerospace etc. |
Market |
Europe, North America, Oceania |
Quality certification |
ISO 90001:2008, TS16949, FDA, REACH, ROHS, SGS |
QC |
Every order production will get more than 10 times regular check and 5 fives times random check by our professional QC. Or by Third party appointed by customer |
|
Mold |
Molding Process |
Injection molding, mold processing, extrusion |
Mould type |
processing mold, injection mold, extrusionmold |
Machines |
350T vacuum pressing machine and other pressing machine at 300T,250T and so on |
Tooling equipment |
Rubber tension tester, Rubber vulcanization instrument, Durometer, calipers, ageing oven |
Cavity |
1~400 cavities |
Mould Life |
300,000~1,00,000 times |
|
Production |
Production capacity |
finish each mold of product in 3 minutes and working on 3 shifts within 24 hours |
Mold lead time |
15~35 days |
Sample lead time |
3~5 days |
Production time |
usually 15~30 days, should be confirmed before order |
Loading port |
Hangzhou, Shanghai, Ningbo or as required |