Description:
Material |
NR, NBR, SBR, EPDM, FKM, Silicone, HNBR, Viton etc. |
Size |
According to drawing |
Color |
Black/White/Blue/Red/Yellow, etc |
Temperature |
Commom: -40~230 Celsius Degrees |
Special features
/Working environment |
Non-toxic; oil-resistance; heat resistance; abrasion-resistance; aging resistance; insulation; acid and alkaline resistancel airtight; shock absorption, etc. |
Application |
Used in household, fitting, pipes and other industry accessories and auto parts. |
Certification |
SGS, RoHS and FDA. |
Delivery time |
20-35days after prepayment received |
MOQ |
100-1000pcs |
Packing details |
According to your request |
Shipment |
By express(DHL/UPS/FEDEX)/By sea/By air |
Port |
FOB SHANGHAI OR NINGBO |
Product show
1. rubber molded products:
2. Auto rubber parts:
PRODUCTS STANDARD |
QUALITY CERTIFICATE |
ISO 9000, TS16949, FDA, REACH, ROHS |
MATERIAL STANDARD |
ASTM D2000, SAE J200, JIN OR AS PER DRAWING |
TOLERANCE STANDARD |
RMA A1,A2,A3, DIN ISO 3302-1,DIN-7715/BS-3734 OR AS PER DRAWING |
COLOR STANDARD |
PANTONE COLOR, RAL COLOR |
QUALITY REPORTS |
PPAP, RAW MATERIAL REPORT, TEST REPORT, OFFCIAL REPORT BY THIRD PARTY |
Other main products:
ADVANTAGED SERVICE TO YOU:
1.Lower freight of sample or goods by DHL, as we have DHL account with bigger discount.
2. Lower price from less management cost, less labor cost and land cost from our new plant.
3. Less FOB cost as it is only 1~3 hours drive from our factory to Ningbo or Shanghai port and airport.
4. More solution for plastic/rubber material and prodution as our boss and engineers have 30 years of experiences in rubber plastic industry.
5. More Effective service: prompt reply for your e-mail within 6 hours, good solution for any problems within 12 hours.
6. More advantaged products: rubber molded/injection parts, plastic injection parts, and silicone extrusion parts.
Order Solution |
Order |
OEM or ODM welcome. Free sample or slab/button of material for your quality evaluation, mold sample in accordance with drawing for approval of mass production, |
Payment terms |
L/C, T/T, WEST UNION, MONEYGRAM, PAYPAL, ESCROW |
Lead time |
3~5 weeks for mold production, and 1~2 weeks for mass production |
Package |
As per customer's favour. Shock-absorbing bags, Cartons, Wooden box, and wooden or plastic pallet, |
Delivery term |
FOB CHINA, CIF destination port, DDP customer's warehouse/address of goods |
Shipment |
By air mail, by sea, by express like DHL, Fedex, UPS, TNT, EMS |
Quality Control |
Sample approval before order, QC test report(maybe by third party) before balance. |